How Long Does a Roof Replacement Take?

A roof replacement on a 2,000 sq ft house usually takes two to four days of work. The crew tears off the old roof, replaces any rotted decking, then lays ice and water shield and new shingles. In North Branch, a city inspector checks the bare deck before the shingles go on. Rain, snow, a steep roof or a second layer can stretch it. Our local roofer can tell you which apply to yours.

Request a Roof Inspection

Fill in the form below or call us now on (651) 427-2051

Best way to reach you

Thanks, we've passed your request to our local roofer and they'll be in touch shortly.

How Long Does It Take to Replace a Roof on a 2,000 Sq Ft House?

Replacing the roof on a 2,000 sq ft house takes two to four days of work for a typical job, based on national figures. A simple roof on a single-family home can be finished in a day or two. A steep roof with dormers, valleys, skylights and a chimney sits at the long end, because each of those features adds work.

Those are days of work on the roof, not the whole calendar. The permit, the materials delivery and the city inspections sit around them, and rain days push everything back. Ask our local roofer for a timeline with your written estimate, since it depends on what they find on your roof.

Typical 2,000 sq ft house

2 to 4 days

Days of work on the roof. Rain and snow days come on top.

6 Things That Make a Roof Replacement Take Longer

A roof replacement takes longer with a large or steep roof, extra layers, rotted decking, bad weather or heavy slate and tile.

Roof size

Square footage is the biggest single factor. A larger roof means more to strip, more to haul away and more shingles to nail.

Pitch and shape

Steep slopes are slower and harder to work on. Chimneys and skylights add more work around each one.

Layers to tear off

A full replacement strips every layer down to the deck. Minnesota allows two layers at most, and the second one is more work before the deck is even visible.

Rotted decking

Soft or rotted sheets found after the tear-off are replaced before anything new goes down. Nobody can see how much until the old roof is off; see roof decking replacement.

Weather

Roofers stay off the roof on rainy or snowy days, and high winds or extreme temperatures stop work too. Cold months bring their own limits; see winter roof replacement in Minnesota.

Material

Slate and tile take longer to install than asphalt shingles because of their weight. See slate roofs and tile roofing.

What Happens Each Day of a Roof Replacement

Each day of a roof replacement has its own job: tear-off on day one, then the new roof over one or two more.

The deck repairs and the North Branch tear-off inspection fall between those two stages, while the deck is still bare.

  1. 1

    Before day one: permit and delivery

    The city permit is pulled first. Shingles and other materials usually arrive a few days ahead and need room in the driveway.

  2. 2

    Day one: tear-off

    On an average-sized roof, the old shingles and underlayment come off in a single day. It is the loudest part of the job.

  3. 3

    Deck check and repairs

    With the deck bare, the crew finds soft or rotted sheets and replaces them, so the new shingles are nailed into sound wood.

  4. 4

    Ice and water shield, then the inspector

    Ice and water shield goes on at the eaves. The city inspector then checks the decking and that the barrier runs 24 inches past the exterior wall.

  5. 5

    Day two or three: the new roof

    Underlayment, starter strips, shingles, flashing and the hip and ridge caps go on. On a typical house this takes one or two days.

  6. 6

    Cleanup and final inspection

    The crew hauls away the old roofing and sweeps the yard with magnets. The city's final inspection follows once all roofing and flashing are in place.

A roofing crew works on a ranch house roof covered in underlayment, with bundles of new shingles stacked along the ridge

For what the job includes and how it is priced, see roof replacement in North Branch.

Want a start date and a price?

Our local roofer will look at your roof and tell you how long your job will take. Send a few details or call (651) 427-2051.

Get Estimate →

How the North Branch Permit and Inspections Fit the Schedule

A North Branch reroof needs a city permit first, then two inspections: one after the tear-off and one when the roof is done.

You or a contractor licensed by the State of Minnesota can apply for the reroof permit, and the fee is due when you apply. The tear-off inspection has to happen while the deck is open, because the inspector looks at the decking and the ice and water shield. Inspections must be booked at least 24 hours ahead, so that visit is set up before the deck is bare, not after.

The final inspection comes once every piece of roofing and flashing is on.

Booking an inspection

24 hours ahead

Both North Branch reroof inspections need at least a day's notice to the city.

Can You Stay in Your House While the Roof Is Being Replaced?

You can stay in your house while the roof is being replaced, but it is loud, and young children and pets do better elsewhere.

The tear-off day is the noisiest. Hammering shakes the walls, and dust from the old roof settles in the attic. Putting the new roof on is quieter, though there is still a lot of activity overhead. If you stay, keep children and pets inside, in a room away from the work and out of the yard where scraps fall.

Ask our local roofer which day the tear-off is planned. Then you can arrange to be out for the worst of it and home for the rest.

Loudest day

Tear-off

Plan time away from the house for the first day if you can.

How to Prepare Your Home for a Roof Replacement: 8 Steps

To prepare your home for a roof replacement, move the cars, plan for children and pets, protect the attic and walls, and clear the yard.

Most of it comes down to two things: falling debris outside and vibration inside. A few minutes of setup saves scratched paint, broken frames and nails in the grass.

WhereWhat to do before the crew arrives
CarsPark on the street the night before. Leave the driveway clear for the materials delivery.
GarageKeep cars out. Granules and nails can drop through an uninsulated garage roof, so cover anything stored there with tarps.
Children and petsArrange a stay with family, friends or a kennel. If they stay home, keep them inside, away from the work.
AtticMove fragile and sentimental items to the ground floor. Lay tarps or drop sheets on the floor to catch the dust.
Walls and shelvesTake down pictures, mirrors and loose decor. Vibration from hammering can knock them off.
Yard and plantsClear a 15-foot zone around the house. Mark prized plants with orange tape and cover flower beds with netting or a tarp.
LawnMow before the crew arrives. Nails are much easier to find in short grass.
Outdoor outletCheck that it works. If you have none, plan to leave a door or window open near an outlet the crew can use.

Ready to plan your new roof?

Send a few details or call (651) 427-2051, and our local roofer will come and look.

Get Estimate →

What Cleanup Looks Like After a Roof Replacement

Cleanup after a roof replacement means hauling off the old roofing, sweeping the yard with magnets and checking gutters and driveway.

Magnets catch nails, but shingle scraps are only found by eye, so walk the yard yourself once the crew is gone. Look at the driveway and lawn too, since equipment can scuff the grass, mark the driveway or drip oil. Raise anything you find before the final payment.

Hold that last payment until the work is done, you are satisfied and the city's final inspection has passed. A holdback clause in the contract lets you do that in writing.

Before the last payment

Walk the yard

Check the lawn, beds, gutters and driveway, and wait for the final inspection to pass.

Questions about roof replacement timing

What is the best month to replace a roof?

A month with dry, mild days. Crews stay off the roof in rain and snow, and extreme temperatures can delay work, so a Minnesota winter loses more days. See winter roof replacement in Minnesota.

What is the average cost to replace a roof on a 2000 square foot home?

About $10,143 on average in Minnesota for a typical 2,000 sq ft home. That is a statewide average, not a quote; your price comes from a roof estimate after the roof is seen.

What is the most expensive part of replacing a roof?

Labor, at about 65 percent of the project cost nationally. That is why steep slopes, extra layers and rotted decking, which all add work, push the price up.

How old should a roof be before you replace it?

Age alone does not settle it. Based on national figures, 3-tab shingles last about 15 to 20 years and architectural shingles about 25 to 30. See how long a roof lasts in Minnesota.

Get a roof estimate

Planning a new roof? Send us the details and our local roofer will look at it, price it in writing and tell you what could stretch the schedule.

Call now (651) 427-2051 Roofing in North Branch and the towns around it

Request a Roof Inspection

Fill in the form below or call us now on (651) 427-2051

Best way to reach you *

Thanks, we've passed your request to our local roofer and they'll be in touch shortly.